
Forms 2 and 3: what comes after backfill
Form 1 is available to pilot today. Forms 2 and 3 extend the same material system into precast tiles and cast formats on the roadmap.
Arash Fallah Tafti
Why SubLay uses ready / in progress / roadmap labels instead of protection percentages, and how to read the validation table.

Mahtab Dehghani
Chairman

Buyers of protective materials for buried concrete are used to big numbers: protection percentages, service-life years, and certificate badges on a datasheet.
On sub-lay.com we publish a validation status table instead: what is ready, what is in progress, and what is still on the roadmap. Each row has a short note so you can scope a job without guessing what sits behind a headline figure.

A percentage only helps when the method, lab, and time base are shared. Finnish infrastructure owners and their contractors need to know what they can scope today versus what is still running.
The SubLay C product page keeps a short readiness list. Each row has an item, a status label, and a plain note. We update the labels when the work moves. Rows stay empty or marked in progress until there is something concrete to point to.
Quantified corrosion-rate reduction, quantified service-life extension, and formal conformity marks appear on the table only when that work is complete and we can describe it in the note. Early feasibility work and partnership discussions stay off the table until there is a published result or a scope you can rely on.
As of this article, the table matches the product page:
| Item | Status |
|---|---|
| SubLay C Form 1 product and placement method | Ready |
| Independent EU laboratory programme | In progress |
| Infrastructure owner and contractor pilots | Open for partners |
| Construction-product conformity | On the roadmap (shown as coming soon on the product page) |
| Circular feedstock qualification | On the roadmap (virgin-mineral grade available for current placements) |
In words:
If a row is still running or planned, the label says so.
Use the table to decide what you can scope now.
Need a site-specific dossier? Request a pilot and we will outline the evidence relevant to your asset.
The validation section on SubLay C is the source of truth. When a label moves, we update it there first.
Many partners start while lab work or conformity paths are still running. Form 1 placement with a monitoring plan is built for that: place carefully, record what you put in the ground, and align procurement to the rows that matter for your timeline.
Request a pilot when you have an asset and a window. We will match your need to what is ready, what is moving, and what is still on the roadmap.
For the staged lab and pilot logic behind the table, see Building a credible durability test programme in our technical notes series.
Keep reading

Form 1 is available to pilot today. Forms 2 and 3 extend the same material system into precast tiles and cast formats on the roadmap.
Arash Fallah Tafti

Who should request a SubLay C pilot in Finland, what a pilot pack includes, and how to use the pilot request form.
Yalda Biabany
Discussion
Comments
Ask about placement, pilots, or product framing. Comments are public; we may reply from the SubLay team.
No comments yet. Be the first to start the thread.